Representative project study. This page describes a typical partitions scope and how FixUp Fab approaches it. It is an illustration of our method and specification, not a record of a specific client job, and it does not carry client names, quotes or contract values. For photographs of completed work see the gallery; for pricing, book a free site visit.
Project snapshot
Category: Partitions · Location: Business Bay · Property type: Commercial office floor · Typical duration: 3–4 weeks
The challenge
- Open-plan floor with no speech privacy for calls or reviews
- Team could not be relocated during works
- Building imposes access windows and lift booking
- Previous partitions on the floor leaked sound over the ceiling
FixUp Fab solution
- Double-glazed acoustic laminated build-up for meeting rooms
- Single glazing for visual-only separation in open zones
- Partitions taken through the ceiling plane, not stopped below it
- Framed doors with full perimeter seals rather than bare slabs
- Cutting and drilling completed off site; glazing done overnight
Scope of work
Results
- Meeting rooms with genuine speech privacy rather than visual separation only
- No lost working days — the floor was usable every morning
- Sound path over the ceiling closed off at the head detail
- Manifestation applied as branding rather than as an afterthought
Want this outcome for your property?
Every Dubai property is different — tower access, opening condition, substrate and glass specification all change the plan. Start with photos and rough dimensions on WhatsApp, or book a free site measurement. We’ll tell you honestly what a similar result requires.
Tell us your community and project type.
Book free site visit WhatsApp FixUp Fab Call +971 56 957 5656